AS9102 FAI vs Automotive PPAP: Key Differences & Comparison

A comprehensive side-by-side analysis of aerospace First Article Inspection (AS9102) and automotive Production Part Approval Process (AIAG PPAP).

By Quality Engineering Research Team 8 min read AS9102 Rev C vs AIAG PPAP 4th Ed.
Table of Contents

1. Overview: Aerospace vs. Automotive Validation

In manufacturing quality assurance, **AS9102 First Article Inspection (FAI)** and **AIAG Production Part Approval Process (PPAP)** serve as the respective gold standards for validating that a production process is ready for serial manufacturing.

While both share the core objective of verifying that manufactured parts meet customer design specifications, their fundamental philosophies reflect the industries they serve:

2. Side-by-Side Comparison Table

Dimension Aerospace AS9102 (FAI) Automotive AIAG PPAP
Governing Body IAQG (International Aerospace Quality Group) AIAG (Automotive Industry Action Group)
Primary Standard AS9102 Rev C PPAP Manual 4th Edition
Standard Package Structure 3 Standard Forms (Form 1, Form 2, Form 3) 18 Core Elements (PSW, PFMEA, Control Plan, etc.)
Typical Sample Size 1 to 3 parts (100% measured) 300 consecutive parts (statistical run)
Statistical Capability (Cpk) Optional / Key Characteristics only Mandatory for all critical features (Cpk ≥ 1.67 / 1.33)
Gage R&R / MSA Calibration records required Formal MSA studies mandatory for all tooling
Ballooned Drawing Mandatory (linked to Form 3) Mandatory (linked to Dimensional Results)

4. AS9102 3 Forms vs PPAP 18 Elements

The structural difference between the two packages is substantial:

AS9102 Structure:
PPAP 18 Elements:

PPAP includes Design Records, Engineering Change Docs, DFMEA, Process Flow Diagrams, PFMEA, Control Plan, MSA / Gage R&R, Dimensional Results (ballooned print), Material/Performance Test Results, Initial Process Studies (Cpk), Qualified Laboratory Documentation, Appearance Approval Report (AAR), Sample Production Parts, Master Sample, Checking Aids, Customer-Specific Requirements, and the final Part Submission Warrant (PSW).

6. The Role of Ballooned Drawings in Both Standards

Despite their differences, ballooned engineering drawings are the universal foundation of both AS9102 and PPAP packages.

In both standards:

Automate Drawing Ballooning for FAI & PPAP

Generate bubble drawings and dimensional inspection sheets formatted for both AS9102 Rev C and PPAP packages in seconds.

Start Free Trial